Land plots

Thelist

оf the sites, intended for the subsequent granting to investors and (or) to the organizations, created in the prescribed manner in the Republic of Belarus by the invertors or with their participation, for building the objects, provided by the investment contracts with the Republic of Belarus on the territory of sity Zhodino

The site location (area, city, the land user)Possible target use of the siteThe rough area of the site, hectaresAn engineering and transport infrastructure (distance from the site)Approximate cadastral value of the site, conventional unitsThe date and number of the decision-making on the site inclusion into the listThe site placement dateon the District executive committee websiteContact person informationComment
 Zhodino6sites20,5 3 258 950    
1Truda str.Industrial-business appointment4,0Motorway of regional appointment – 10 km;Railway station-5 km;Branch line – 0,1 km;Gas pipeline – to 1 km (д 530 and 325 mm);Electric main – to 1 km (200 кВ);Water supply network – to 1 km (д 150 mm)634 400№ 1349 from 02.09.201303.09.2013Zavadskaja T.P/ tel. 35152Bakun N.NLand office,Chief,tel.37093 
2Truda str.Industrial-business appointment2,0Motorway of regional appointment – 10 km;Railway station – 5 km;Branch line – 0,1 km;Gas pipeline – to 1 km (д 530 and 325 mm);Electric main – to 1 km (200 кВ);Water supply network – to 1 km (д 150 mm)318 200№ 1349 from 02.09.201303.09.2013Zavadskaja T.P/ tel. 35152Bakun N.NLand office,Chief,tel.37093 
3Zelenoborskaja str.Industrial and public-warehouse appointment7,5Motorway of regional appointment – 10 km;Railway station – 8 km;Gas pipeline – to 2 km (д 150 mm);Electric main – to 1 km (200 кВ);Water supply network – to 2 km (д 63 mm)743 250№ 1349 from 02.09.201303.09.2013Zavadskaja T.P/ tel. 35152Bakun N.NLand office,Chief,tel.37093 
4Zelenoborskaja str.Industrial and public-warehouse appointment4,0Motorway of regional appointment – 10 km;Railway station – 7 km;Gas pipeline – to 1 km (д 32,57,425 mm);Electric main – to 0,5 km (200 кВ);Water supply network – to 1 km (д 150 mm)636 400№ 1349 from 02.09.201303.09.2013Zavadskaja T.P/ tel. 35152Bakun N.NLand office,Chief,tel.37093 
5Crossroads Zelenoborskaja str. and Truda str.Industrial-business appointment2,0Motorway of republican value – 10 km;Railway station – 2 km;Branch line – 0,1 km;Gas pipeline – to 1 km (д 530 and 325 mm);Electric main – to 1 km (200 кВ);Water supply network – to 1 km (д 150 mm)318 200№ 1809 from 12.11.201313.11.2013Zavadskaja T.P/ tel. 35152Bakun N.NLand office,Chief,tel.37093 
6Nauchnaja str.Hostel1,0Автодорога Motorway of republican value – 0,29 km;From railway station – 3 km;From a branch line – 2 km;From gas pipelines-taps – to 1 km (d 530 and 325 mm);From an electric main – to 1 km;From water supply networks – to 1 km (d 150 mm)608 500№ 125 from 24.01.201427.01.2014Zavadskaja T.P/ tel. 35152Bakun N.NLand office,Chief,tel.37093– It-is necessary to fulfil requirements of Sanitary norms, rules and hygienic specifications distance between a building of hotel and border of territories of objects of Open Company “Стройтехмаш” and РУП «НПЦ АН Belarus on agriculture» should make not less 50м; the territory should be arranged well and planted trees and shrubs on site perimetre).- Withdrawal of a part of the ground area from the earths RUP «the Scientifically-practical centre of National academy of sciences of Belarus on agriculture».- With a condition of carrying out of a transmission line